- Water, drain, electrical, and filtration setup
- Manufacturer startup procedure followed
- Installation documented for warranty
- Clean, code-compliant water & drain hookups
Done right the first time
We confirm the location has adequate clearance and airflow, connect water and drain lines correctly, verify electrical requirements, install filtration, and complete the manufacturer's startup procedure.
Proper installation is also what protects your manufacturer warranty — we document the setup so your coverage stays intact.
Sizing and equipment advice
Not sure which machine you need? We help you match production capacity and bin size to your real demand so you're not constantly running out of ice or paying to make more than you use.
